1. ຜະລິດຕະພັນເກີນview
The GEYA GRT6-B2 is an electronic delay off time relay designed for industrial and domestic applications. It features adjustable delay settings and is suitable for DIN rail mounting. This manual provides essential information for safe installation, operation, and maintenance.
ຄຸນນະສົມບັດທີ່ສໍາຄັນ:
- ການຊັກຊ້າທີ່ສາມາດປັບໄດ້: Delay can be set directly via panel knobs for convenience and intuitive control.
- ໂໝດຟັງຊັນ: Supports two primary functions: Delay ON (A) and Delay OFF (B). The GRT6-B2 model features 2SPDT (2NO2NC) contacts.
- ຊ່ວງເວລາກວ້າງ: Time scale from 0.1 seconds to 10 days, divided into 10 selectable ranges.
- ຕົວຊີ້ບອກສະຖານະ: Equipped with LED indicators for power (green light) and working status (red light).
- ການອອກແບບກະທັດຮັດ: Ultra-small size, only 18mm width, designed for 35mm DIN rail mounting.

2. ຂໍ້ມູນຄວາມປອດໄພ
Please read this manual carefully before installation and operation. Failure to follow these instructions may result in equipment damage, injury, or death. This device should only be installed and serviced by qualified personnel.
- Always disconnect power before installing, wiring, or performing maintenance on the device.
- ໃຫ້ແນ່ໃຈວ່າສາຍໄຟທັງຫມົດປະຕິບັດຕາມລະຫັດໄຟຟ້າທ້ອງຖິ່ນແລະແຫ່ງຊາດ.
- ຢ່າໃຊ້ງານອຸປະກອນຖ້າມັນເສຍຫາຍ ຫຼື ເຮັດວຽກຜິດປົກກະຕິ.
- ປົກປ້ອງອຸປະກອນຈາກຄວາມຊຸ່ມຊື່ນ, ຂີ້ຝຸ່ນ, ແລະອຸນຫະພູມທີ່ຮຸນແຮງ.
- ຢືນຢັນ voltage and current ratings before connecting to a power source.
3. Product Dimensions and Components
The GRT6-B2 relay is designed for compact installation on a DIN rail. Understanding its dimensions and component layout is crucial for proper integration into your system.


4. ການຕິດຕັ້ງ ແລະ ສາຍໄຟ
The GEYA GRT6-B2 relay is designed for easy installation on a 35mm DIN rail. Follow these steps for secure mounting and correct electrical connections.
4.1 DIN Rail Mounting
The relay snaps onto a standard 35mm DIN rail. Ensure it is securely fastened to prevent movement during operation.
4.2 ສາຍໄຟຟ້າ
Refer to the wiring diagrams below for proper connection of the power supply and load. Always ensure power is disconnected before wiring.

4.3 Power Connection Demonstration
Watch this video for a visual guide on connecting power and load to the GRT6-B1 model, which shares similar wiring principles with the GRT6-B2.
5. ຄໍາແນະນໍາການດໍາເນີນງານ
The GRT6-B2 relay offers adjustable delay functions. Follow these steps to configure and operate your device.
5.1 Function Modes
The GRT6-B2 supports two main function modes:
- A: Delay ON: The output contacts close after a set delay time once power is applied.
- B: Delay OFF: The output contacts open after a set delay time once the trigger signal is removed or power is disconnected.

5.2 ການຕັ້ງຄ່າເວລາ
The delay time is set using two rotary knobs on the front panel: one for time range and one for percentage.

5.3 ຕົວຊີ້ວັດ LED
- LED ສີຂຽວ: ສະແດງສະຖານະການສະໜອງພະລັງງານ.
- ໄຟແດງ: Indicates the working status of the relay (e.g., timing in progress, output active).
6. ບໍາລຸງຮັກສາ
The GEYA GRT6-B2 time relay is designed for reliable operation with minimal maintenance. However, periodic checks can help ensure its longevity and proper function.
- ທໍາຄວາມສະອາດ: ຮັກສາອຸປະກອນໃຫ້ສະອາດ ແລະບໍ່ມີຂີ້ຝຸ່ນ ແລະສິ່ງເສດເຫຼືອ. ໃຊ້ຜ້າແຫ້ງ, ອ່ອນໆເພື່ອເຮັດຄວາມສະອາດ. ຢ່າໃຊ້ນໍ້າສະອາດ.
- ການກວດກາ: Periodically inspect wiring connections to ensure they are secure and free from corrosion. Check for any signs of physical damage or overheating.
- ສະພາບແວດລ້ອມ: ຮັບປະກັນວ່າສະພາບແວດລ້ອມການດຳເນີນງານຍັງຄົງຢູ່ພາຍໃນຂອບເຂດອຸນຫະພູມ ແລະ ຄວາມຊຸ່ມຊື່ນທີ່ກຳນົດໄວ້ເພື່ອປ້ອງກັນການລົ້ມເຫຼວກ່ອນໄວອັນຄວນ.
7. ການແກ້ໄຂບັນຫາ
If the GEYA GRT6-B2 relay is not functioning as expected, consider the following common issues:
- No Power Indication (Green LED Off): Check the power supply connections (A1, A2) and ensure the voltage is within the specified range (AC/DC 24V-240V).
- Relay Not Activating/Deactivating:
- Verify the function mode (A or B) is correctly selected.
- Check the time range and percentage ການຕັ້ງຄ່າ.
- Ensure the trigger signal (S) is correctly applied for Delay OFF functions.
- Inspect load connections and ensure the load is functioning correctly.
- ກຳນົດເວລາບໍ່ຖືກຕ້ອງ: Re-check the time range and percentage settings. Ensure the knobs are firmly set to the desired values.
- ຄວາມຮ້ອນເກີນ: If the device feels excessively hot, check the load current to ensure it does not exceed the relay's maximum rating (10A/AC1).
If problems persist after checking these points, contact a qualified electrician or the manufacturer for assistance.
8. ຂໍ້ມູນຈໍາເພາະ
Detailed technical specifications for the GEYA GRT6-B2 time relay.

| ພາລາມິເຕີ | ມູນຄ່າ |
|---|---|
| ຍີ່ຫໍ້ | GEYA |
| ຕົວແບບ | GRT6-B2 |
| ຟັງຊັນ | Delay ON (A), Delay OFF (B) |
| Supply Terminals | A1-A2 |
| ສະບັບtage ຂອບເຂດ | AC/DC 24V-240V (50-60Hz) |
| ການປ້ອນຂໍ້ມູນພະລັງງານ | AC max. 6VA/1.9W |
| ຊ່ວງເວລາ | 0.1s - 10 days (ON, OFF) |
| ການຕັ້ງຄ່າເວລາ | Potentiometer |
| ຜົນຜະລິດ | 2xSPDT (2NO2NC) |
| ການຈັດອັນດັບປັດຈຸບັນ | 10A/AC1 |
| ສະຫຼັບ Voltage | 250VAC/24VDC |
| ອຸນຫະພູມປະຕິບັດການ | -20°C ຫາ +55°C (-4°F ຫາ 131°F) |
| ອຸນຫະພູມການເກັບຮັກສາ | -35°C ຫາ +75°C (-22°F ຫາ 158°F) |
| ການຕິດຕັ້ງ | DIN rail EN/IEC 60715 |
| ຂະໜາດ (L x W x H) | 64mm x 18mm x 95mm (ປະມານ) |
| ນ້ຳໜັກ | ປະມານ. 2.08 ອອນ |
9. ການຮັບປະກັນແລະການສະຫນັບສະຫນູນ
For warranty information, please refer to the documentation provided with your purchase or contact your seller. If you require technical support or have questions regarding the GEYA GRT6-B2 time relay, please reach out to the manufacturer or authorized distributor.





