The Vertiv Geist Switched Rack PDU (Power Distribution Unit) model VP5N31A0 is designed to provide reliable power distribution and advanced power management capabilities within data centers and IT environments. This 1U horizontal PDU features input power monitoring and individual outlet switching, allowing for remote control and optimization of connected equipment. This manual provides essential information for the safe and efficient installation, operation, and maintenance of your PDU.

2. ຄຸນນະສົມບັດທີ່ສໍາຄັນ

  • ສະຫຼັບປລັກສຽບ: Remotely turn off individual NEMA 5-20R receptacles to prevent accidental overloads or power cycle unresponsive IT equipment.
  • Input Power Monitoring: Monitor power consumption at the PDU level to optimize energy usage and capacity planning.
  • Next-Generation Interchangeable Monitoring Device (IMD): Features a 128x128 high-contrast LCD for clear display of power data. The IMD includes an internal sensor that automatically adjusts screen orientation for horizontal or vertical installations.
  • ຄວາມປອດໄພທີ່ປັບປຸງ: Incorporates secure boot with a hardware-based trust anchor to protect data and operations.
  • Redundant Power-Sharing Port: Allows connection of two IMDs for backup power to the monitoring device in case of primary power loss.
  • ການຢັ້ງຢືນອຸດສາຫະກໍາ: UL Listed, TAA-Compliant, and RoHS certified, ensuring compliance with industry standards.
  • ຄວາມໜ້າເຊື່ອຖື: Each unit undergoes individual testing for functionality and reliability.

3. ການຕິດຕັ້ງແລະການຕິດຕັ້ງ

3.1 ການຫຸ້ມຫໍ່ແລະການກວດກາ

Carefully unpack the PDU and inspect it for any signs of shipping damage. Report any damage to your supplier immediately. Ensure all components listed in the packing slip are present.

3.2 ການຕິດຕັ້ງ Rack

The VP5N31A0 is a 1U horizontal rack-mount unit. Install the PDU into a standard 19-inch equipment rack using the provided mounting hardware. Ensure adequate airflow around the unit for proper heat dissipation.

3.3 ການເຊື່ອມຕໍ່ພະລັງງານ

  1. Connect the PDU's NEMA L5-30P input plug to a compatible 30A, 120V power source.
  2. Ensure the power source is properly grounded and capable of supplying the required 2.8kW capacity.
  3. Verify that the power cable is securely connected and routed to prevent accidental disconnection or damage.

3.4 ອຸປະກອນເຊື່ອມຕໍ່

Plug your IT equipment into the (12) NEMA 5-20R receptacles on the PDU. Distribute the load evenly across the outlets to avoid overloading any single circuit or the PDU itself.

3.5 ການເຊື່ອມຕໍ່ເຄືອຂ່າຍ (ທາງເລືອກ)

For remote monitoring and control, connect the PDU's network port to your network infrastructure using a standard Ethernet cable. Refer to the IMD documentation for network configuration details.

4. ຄໍາແນະນໍາການດໍາເນີນງານ

4.1 Interchangeable Monitoring Device (IMD)

The IMD provides real-time power data and access to PDU settings. The 128x128 high-contrast LCD displays information such as total power consumption (W), energy usage (KWh), apparent power (VA), and power factor (PF).

ໃກ້ຊິດ view of the Vertiv Geist PDU's Interchangeable Monitoring Device (IMD) display, showing power readings and navigation buttons.

Figure 1: Close-up of the IMD display showing power metrics.

4.2 Remote Outlet Switching

The switched outlets allow for remote control of power to connected devices. This functionality is typically accessed via a web interface or network management system connected to the PDU's network port. Consult the PDU's network management guide for detailed instructions on configuring and using remote outlet control.

4.3 Power Cycling Equipment

In situations where IT equipment becomes unresponsive, the remote outlet switching feature can be used to power cycle individual devices without requiring physical access to the rack. This helps minimize downtime and streamline maintenance.

5. ບໍາລຸງຮັກສາ

5.1 ການເບິ່ງແຍງທົ່ວໄປ

Keep the PDU and its surroundings clean and free from dust. Ensure that ventilation openings are not obstructed. Do not use liquid or aerosol cleaners directly on the unit.

5.2 ການອັບເດດເຟີມແວ

Periodically check the Vertiv support website for available firmware updates for your PDU's IMD. Firmware updates can provide new features, performance improvements, and security enhancements. Follow the instructions provided with the firmware update package carefully.

6. ການແກ້ໄຂບັນຫາ

  • ບໍ່ມີໄຟໄປຫາປລັກສຽບ: Verify the PDU's input power cable is securely connected to a live power source. Check the circuit breaker on the PDU (if applicable) and the upstream circuit breaker.
  • IMD Display Not Active: Ensure the PDU is receiving power. If the IMD is modular, verify it is correctly seated.
  • Cannot Access PDU Remotely: Check network cable connections. Verify network settings (IP address, subnet mask, gateway) on the PDU and your network. Ensure there are no firewall restrictions.
  • ຕົວຊີ້ວັດການໂຫຼດເກີນ: If the PDU indicates an overload, immediately reduce the connected load. Use the remote switching feature to turn off non-critical devices.
  • Unresponsive Equipment: Utilize the remote outlet switching feature to power cycle the specific unresponsive device.

7. ຂໍ້ມູນຈໍາເພາະ

ໝາຍເລກຕົວແບບVP5N31A0
ປັດໄຈແບບຟອມ1U Horizontal Rackmount
ການປ້ອນຂໍ້ມູນ Voltage120 ໂວນ
ປ້ອນຂໍ້ມູນ Ampອາຍຸ30 Amps
ຄວາມອາດສາມາດພະລັງງານ2.8 kW (2800 ວັດ)
ປລັກອິນພຸດNEMA L5-30P
ຂາອອກ(12) NEMA 5-20R
ນ້ໍາຫນັກລາຍການ18.4 ປອນ
ຂະໜາດແພັກເກັດ24 x 24 x 6 ນິ້ວ
ຜູ້ຜະລິດVertiv
ASINB0DHMLBGHV
UPC767041044812

8. ການຮັບປະກັນແລະການສະຫນັບສະຫນູນ

8.1 ການຮັບປະກັນຜະລິດຕະພັນ

The Vertiv Geist Switched Rack PDU VP5N31A0 comes with a standard three-year warranty. This warranty can be extended to five years if the unit is registered within 120 days of purchase. Refer to the official Vertiv webເວັບໄຊສໍາລັບເງື່ອນໄຂການຮັບປະກັນທີ່ສົມບູນ.

8.2 ສະຫນັບສະຫນູນດ້ານວິຊາການ

For technical assistance, troubleshooting, or inquiries regarding your Vertiv product, please visit the official Vertiv support website or contact their customer service. Have your product model number (VP5N31A0) and serial number ready when contacting support.

ເອກະສານທີ່ກ່ຽວຂ້ອງ - VP5N31A0

ກ່ອນview Geist™ Intelligent Rack PDU Installer/User Guide - Vertiv
Comprehensive installer and user guide for Vertiv's Geist™ Intelligent Rack PDU, covering installation, setup, network configuration, and advanced features for data center environments.
ກ່ອນview Vertiv SmartRow 2 Infrastructure Solution Installer/User Guide
This comprehensive guide provides detailed instructions for the installation, operation, and maintenance of the Vertiv SmartRow 2 Infrastructure Solution. It covers system overview, features, safety instructions, power management, network configuration, and troubleshooting.
ກ່ອນview Avocent DSView ແລະ Plug-ins Software Rack Power Manager: ຂ່າວສານດ້ານວິຊາການ
ຂ່າວສານທາງດ້ານວິຊາການນີ້ຈາກ Vertiv ໃຫ້ຄໍາແນະນໍາທີ່ສົມບູນແບບກ່ຽວກັບການນໍາໃຊ້ Avocent DSView ແລະປລັກອິນຊອບແວ Rack Power Manager. ເຄື່ອງມືເຫຼົ່ານີ້ເສີມຂະຫຍາຍຄວາມສາມາດໃນການຄຸ້ມຄອງສໍາລັບໂຄງສ້າງພື້ນຖານ IT, ຊ່ວຍໃຫ້ຜູ້ໃຊ້ສາມາດເຂົ້າເຖິງ, ຕິດຕາມ, ແລະຄວບຄຸມອຸປະກອນທີ່ກວ້າງຂວາງ, ລວມທັງ PDUs, UPSes, console servers ແລະສະພາບແວດລ້ອມ virtualization.
ກ່ອນview Vertiv Geist Watchdog 100 ຕົວຕິດຕັ້ງ/ຄູ່ມືຜູ້ໃຊ້
ຄູ່ມືທີ່ສົມບູນແບບສໍາລັບການຕິດຕັ້ງແລະການນໍາໃຊ້ Vertiv Geist Watchdog 100 ຕິດຕາມກວດກາສິ່ງແວດລ້ອມ, ກວມເອົາການຕິດຕັ້ງ, ການຕັ້ງຄ່າເຄືອຂ່າຍ, web ການໂຕ້ຕອບ, ເຊັນເຊີ, ສັນຍານເຕືອນ, ແລະຂໍ້ມູນຄວາມປອດໄພ.
ກ່ອນview ຄູ່ມືຕິດຕັ້ງ/ຜູ້ໃຊ້ເຄື່ອງປັບຄວາມຈຸຂອງເຄື່ອງປັບຄວາມຈຸ Vertiv Liebert Mini-Mate
ຄູ່ມືຕິດຕັ້ງ ແລະ ຜູ້ໃຊ້ທີ່ຄົບຖ້ວນສຳລັບເຄື່ອງປັບອາກາດພາຍໃນ Vertiv Liebert Mini-Mate Variable Capacity, ເຊິ່ງກວມເອົາການຕິດຕັ້ງ, ການດຳເນີນງານ, ການບຳລຸງຮັກສາ ແລະ ຄວາມປອດໄພສຳລັບລຸ້ນທີ່ລະບາຍຄວາມຮ້ອນດ້ວຍນ້ຳ/ໄກຄໍ ແລະ ລະບາຍຄວາມຮ້ອນດ້ວຍອາກາດ.
ກ່ອນview ຄູ່ມືການຕິດຕັ້ງດ່ວນ Avocent MergePoint Unity
ຄູ່ມືນີ້ໃຫ້ຄໍາແນະນໍາຂັ້ນຕອນໂດຍຂັ້ນຕອນສໍາລັບການຕິດຕັ້ງ Avocent MergePoint Unity KVM ຜ່ານ IP ແລະ serial console switch, ລວມທັງການເຊື່ອມຕໍ່ພອດທ້ອງຖິ່ນ, ໂມດູນ IQ, ອຸປະກອນເປົ້າຫມາຍ, ຜູ້ໃຊ້ເຄືອຂ່າຍ, ແລະໂມເດັມທາງເລືອກຫຼື PDUs.